Two tickets, priced apart
| Ticket row | Replacement reading | Repair reading |
|---|---|---|
| Frame A single 5x5 slab row | $130-$380 | not a repair row |
| Frame A 100 sq ft sidewalk row, 4 in | $800-$1,200 | not a repair row |
| Frame B remove-and-replace row, per square foot | $10-$25+ | not a repair row |
| Frame B sealing and caulking row, per square foot | not a replacement row | $1-$3 |
| Frame B resurfacing row, per square foot | not a replacement row | $3-$7 |
Each reading is one frame counting of one ticket row, never blended. Replacement takes the old walk out and pours a new one; repair works the walk that stands.
Replacement size lines, printed once
| Size row, Frame A | 4 in reading | 6 in reading |
|---|---|---|
| 75 sq ft row | $600-$900 | $700-$1,000 |
| 100 sq ft sidewalk row | $800-$1,200 | $900-$1,300 |
| 130 sq ft row | $1,050-$1,550 | $1,150-$1,700 |
| 200 sq ft sidewalk row | $1,600-$2,400 | $1,800-$2,600 |
| Average row, per square foot | about $10 | about $2,000 for 200 sq ft |
| Single 5x5 slab replacement row | $130-$380 | one slab row |
| Slab concrete row, per square foot | about $6 | concrete line only |
| Demolition row, per square foot | $2-$6 | disposal up to $230 per ton |
| Labor row, per hour | about $75 | $50-$130 |
The size lines stand once here, inside Frame A alone, the two thickness lines held apart.
Repair and tier lines, printed once
| Repair row, Frame B | Per square foot reading | Frame B note |
|---|---|---|
| Sealing and caulking row | $1-$3 | repair row |
| Grinding row | $1-$4 | repair row |
| Mudjacking row | $3-$6 | the lifting ticket, named apart |
| Resurfacing row | $3-$7 | repair row |
| Removal row | $3-$8 | repair row |
| Replacement and repour row | $10-$25+ | replacement row |
| Remove-and-replace row | $10-$25+ | replacement row |
| Sealing row | $1-$3 | sealing line only |
Repair rows stand as their own rows here, inside Frame B alone; the mudjacking row stands there as the lifting ticket. Frame B tier lines in prose: basic $7-$12, mid-range $12-$17, high-end custom $17-$20, total installed $7-$17 and $1,400-$3,400 for a 4 ft by 50 ft sidewalk, materials $2-$6, labor and supplies $5-$11, permit $50-$100. The frames count the same job on different bases -- a per-square-foot average and a size table in Frame A against tier, total, and repair tables in Frame B. Those differences are named as frame differences on every page, never averaged.
The neighbours named apart
Named apart, never a row here: concrete sealing (it seals an existing walk), concrete lifting and mudjacking (they level an existing slab; its row stands inside Frame B only), paver walkways and paver driveways, and asphalt paving -- this cluster prices sidewalk installation, replacement, and repair alone.
The local read
The local read: the frames above are national published frames, and a written quote for one address, one size, and one thickness is the only local figure; the frames stand as published, apart, never blended.
Reading a versus quote
- Ticket named beside each figure
- Replacement lines read apart from repair lines
Frequently asked questions
What does replacement print at against repair, as reported?
Replacement prints at $800 to $1,200 for a 100 sq ft sidewalk at 4 in thick inside Frame A, and at $10 to $25+ per square foot on the Frame B remove-and-replace row. Repair prints far lower inside Frame B, from $1 to $3 for sealing and caulking to $3 to $7 for resurfacing -- a different ticket.
What does the mudjacking row print at, as reported?
Frame B prints mudjacking at $3 to $6 per square foot inside its repair table. That row stands as the lifting ticket and blends into no replacement row.
What does a single slab replacement print at, as reported?
Frame A prints a single 5x5 slab replacement at $130 to $380. Frame B counts single-section work inside its repair rows at $1 to $3, $1 to $4, and $3 to $8 per square foot -- two countings, priced apart.
Do the frames change on this guide?
No. Frame A still prints its average at about $10 per square foot and Frame B its total installed band at $7 to $17 per square foot. The versus rows blend nothing.
Is asphalt paving priced on this guide?
No. Asphalt paving is its own purchase on its own pages, named apart here. This guide prices sidewalk replacement against repair alone.