Mudjacking vs Polyjacking: Cost and Method Compared
Concrete lifting comes in two methods -- mudjacking and polyjacking -- and they price very differently. In 2026 data mudjacking runs $3 to $9 per square foot while polyjacking foam runs $5 to $15, reaching $25 on complex jobs. The price gap buys smaller holes, faster cure, lighter material, and better water resistance -- but mudjacking wins plenty of jobs on price alone. This guide compares both honestly so the quote in your hand makes sense.
Orange County, CA · Updated 2026 · Costs shown as ranges — your quote will vary by contractor and scope
Mudjacking: how it works and what it costs
Mudjacking -- also called slabjacking -- pumps a cement-based slurry (sand, cement, and water, sometimes with additives) through 1-to-2-inch holes drilled in the slab. The slurry fills the void underneath and hydraulically lifts the concrete back toward level. At $3 to $9 per square foot it is the budget method, and on large, straightforward areas it is often the economical choice by a wide margin. The trade-offs are physical: the slurry is heavy -- roughly 100 pounds per cubic foot -- which can stress weak or saturated soils and invite future settlement. Cure time is 24 to 48 hours before heavy use. And the 2-inch holes need patching afterward, which is cosmetic work on a driveway but visible. The slurry can also erode if water keeps moving through the soil beneath it.
Polyjacking: how it works and what it costs
Polyjacking injects a two-part polyurethane foam that expands on contact, fills the void, and lifts the slab -- all through holes about the size of a penny (roughly 5/8 inch). At $5 to $15 per square foot, reaching $25 on complex jobs, it costs roughly double mudjacking per square foot. What the premium buys: the foam weighs about 2 to 4 pounds per cubic foot -- a tiny fraction of slurry weight -- so it does not stress weak soils. It cures in about 15 minutes, so most jobs are drive-on the same day. It resists water instead of eroding, and the penny-size holes patch nearly invisibly. The premium is real money, but so are the advantages -- particularly where water or weak soil is part of the problem.
Head-to-head: the honest comparison
Put side by side, the methods differ on five axes. Price: mudjacking $3 to $9 per square foot; foam $5 to $15 (to $25 complex) -- mudjacking wins on pure dollars. Hole size: 1 to 2 inches versus penny-size -- foam wins on cosmetics. Cure time: 24 to 48 hours versus about 15 minutes -- foam wins on speed. Weight: heavy slurry versus featherweight foam -- foam wins on weak or saturated soils. Water resistance: slurry can erode under persistent water flow; foam resists it -- foam wins where drainage is the cause. Longevity: both last when the underlying water issue is addressed; neither lasts when it is not. The table below compresses the comparison; the sections after it say when each method is the right call.
When mudjacking wins
Mudjacking is the right call in three situations. First, budget-first jobs on large areas: a big driveway or patio where the per-square-foot gap compounds into thousands -- mudjacking's $3-to-$9 band against foam's $5-to-$15 is the difference between a $1,500 job and a $3,000 one. Second, stable, dry soils where weight is not a concern and water is not the cause -- the slurry's weaknesses never come into play. Third, cosmetic tolerance: on plain concrete where patched 2-inch holes are acceptable, the hole-size advantage of foam is worth little. In these lanes mudjacking is not the cheap compromise -- it is the rational choice, and paying the foam premium would buy advantages the job does not need.
When foam wins
Foam earns its premium in four situations. First, water-driven settlement: where irrigation, drainage, or groundwater caused the void, foam's water resistance protects the lift in a way slurry cannot. Second, weak or saturated soils: the featherweight material does not add load to ground that is already struggling. Third, speed: same-day drive-on matters for commercial entries, shared driveways, and anyone who cannot park elsewhere for two days. Fourth, cosmetics: decorative, stamped, or exposed-aggregate concrete where 2-inch patched holes would scar the surface -- penny-size holes all but disappear. When two or more of these apply, the foam premium is money well spent; when none apply, it is money spent on nothing.
Mudjacking vs polyjacking compared (2026, informational ranges)
| Factor | Mudjacking |
|---|---|
| Typical band | $3 – $9 / sq ft |
| Material | Cement-based slurry |
| Hole size | 1 – 2 inches |
| Cure time | 24 – 48 hours |
| Weight | Heavy (~100 lb / cu ft) |
| Water resistance | Can erode under flow |
| Best for | Budget jobs, large areas, dry soils |
DIY vs. hiring a pro
Owner-done lanes: noting which method each bidder proposes and why, asking how they handle the water or soil cause behind the settlement, and checking whether patched hole size matters on your concrete finish -- the questions that separate a method recommendation from a method habit.
What drives the price up or down
- Method -- foam costs roughly double mudjacking
- Void depth -- deeper voids need more material
- Soil and water -- the cause behind the settlement
- Cosmetic finish -- stamped/decorative favors foam
- Access and scheduling -- same-day vs 48-hour cure
- OC market -- top half of every band
How to keep the cost down
- Ask each bidder WHY their method fits your soil and water situation
- Get hole size and cure time in writing with the price
- On decorative concrete, price the cosmetic difference explicitly
- Compare two quotes when the price beats the local average
Frequently asked questions
Which is cheaper, mudjacking or polyjacking?
Mudjacking: $3 to $9 per square foot versus $5 to $15 for foam (to $25 complex). Foam's premium buys smaller holes, 15-minute cure, lighter weight, and water resistance.
How long does mudjacking last versus foam?
Both last when the water or soil cause is addressed. Foam has an edge where water is the cause -- it resists erosion; slurry can erode under persistent flow.
Are the holes visible after concrete lifting?
Mudjacking's 1-to-2-inch holes are patched but visible on close inspection. Foam's penny-size holes patch nearly invisibly -- the difference matters on decorative finishes.
Can I drive on lifted concrete right away?
With foam, usually the same day (15-minute cure). With mudjacking, wait 24 to 48 hours. Confirm cure time in writing before scheduling around it.
Does foam lifting work on weak soil?
That is foam's strongest lane: 2 to 4 pounds per cubic foot adds almost no load, versus slurry at roughly 100. On stable dry soil the difference rarely matters.